Swiftbrick Builders specialises in structural alterations in Swindon, including wall removals, RSJ installations and internal reconfigurations. We help transform layouts while ensuring structural integrity and compliance.
Not sure where to start? We’re happy to offer advice.
We provide safe and reliable structural work to open up spaces and improve the flow of your home.
Open up your home with professional load-bearing and non-load-bearing wall removals.
Expert installation of steel beams to support new openings and layouts.
Transform your property with modern open-plan living spaces.
Rework your home layout to better suit your needs and lifestyle.
A professionally built stud wall project designed to divide space efficiently, improve room layout, and create a practical finish that blends seamlessly with the rest of the property.
View ProjectAll structural work is carried out with safety and compliance in mind.
Skilled builders with experience in structural modifications.
Accurate installations and clean finishes throughout.
Trusted by homeowners across Swindon for quality work.
We carry out structural alterations across Swindon and surrounding areas.
Swindon, Royal Wootton Bassett, Highworth, Wanborough, Marlborough, and Wroughton
Structural changes involve altering the core structure of a building, such as removing load-bearing walls, installing steel beams (RSJs), creating open-plan spaces, or modifying layouts. These changes require expert planning and professional installation.
Yes, we safely remove load-bearing walls and install structural supports such as steel beams (RSJs) to maintain the integrity of your property. All work is carried out to building regulations standards.
Yes, most structural alterations require building regulations approval to ensure the work is safe and compliant. We handle the process and liaise with building control on your behalf.
The cost of removing a wall depends on whether it is load-bearing. Non-structural walls may cost from £1,000, while load-bearing wall removal with steel beam installation can range from £3,000–£8,000 depending on complexity.
An RSJ (Rolled Steel Joist) is a structural beam used to support loads when walls are removed. It ensures the building remains stable and safe after structural changes.
Most structural changes take between a few days to a few weeks depending on the scale of work. We provide a clear timeline before starting and minimise disruption where possible.
Yes, when carried out by experienced professionals. We follow strict building regulations and engineering guidance to ensure all structural work is completed safely and to the highest standard.
Contact Swiftbrick Builders today to discuss your project and get a free quote.